1、安裝地點(diǎn)需保持通風(fēng)良好,發(fā)電機(jī)端應(yīng)有足夠的進(jìn)風(fēng)口,柴油機(jī)端應(yīng)有良好的出風(fēng)口。出風(fēng)口面積應(yīng)大于水箱面積1.5倍以上。
1. The installation site should maintain good ventilation, with sufficient air inlet at the generator end and good air outlet at the diesel engine end. The area of the air outlet should be more than 1.5 times the area of the water tank.
2、安裝地的周邊應(yīng)保持干凈,防止在周邊置放能造成酸堿性、偏堿等腐蝕汽體和蒸氣的物件。有標(biāo)準(zhǔn)的應(yīng)配備救火設(shè)備。
2. The surrounding area of the installation site should be kept clean to prevent placing objects that can cause corrosion of vapors and vapors such as acidity, alkalinity, etc. Those with standards should be equipped with firefighting equipment.
3、 若在室內(nèi)使用,必須將排煙管道通到室外,管徑必須≥消音器的出煙管直徑,所接之管路的彎頭不宜超過(guò)3個(gè),以保證排煙暢通,并應(yīng)將管子向下傾斜5--10度,避免雨水注入;若排氣管是垂直向上安裝的,則必須加裝防雨罩。
3. If used indoors, the smoke exhaust pipe must be connected to the outside, with a diameter ≥ the diameter of the exhaust pipe of the silencer. The elbows of the connected pipeline should not exceed 3 to ensure smooth smoke exhaust, and the pipe should be tilted down 5-10 degrees to avoid rainwater injection; If the exhaust pipe is installed vertically upwards, a rain cover must be installed.
4、基礎(chǔ)采用混凝土?xí)r,在安裝時(shí)須用水平尺測(cè)其水平度,使機(jī)組固定于水平的基礎(chǔ)上。機(jī)組與基礎(chǔ)之間應(yīng)有專用防震墊或用底腳螺栓。
4. When the foundation is made of concrete, the levelness must be measured with a level ruler during installation to fix the unit on a horizontal foundation. There should be dedicated shockproof pads or anchor bolts between the unit and the foundation.
5、 發(fā)電機(jī)組機(jī)殼務(wù)必有靠譜的接地保護(hù),對(duì)必須有中性點(diǎn)立即接地裝置的發(fā)電機(jī)組,則務(wù)必由專業(yè)技術(shù)人員開展中性點(diǎn)接地,并配置防雷設(shè)施,禁止運(yùn)用電壓的接地系統(tǒng)開展中性點(diǎn)立即接地裝置。
5. The generator unit shell must have reliable grounding protection. For the generator unit that must have a neutral point immediate grounding device, professional technicians must carry out the neutral point grounding, and configure lightning protection facilities. It is prohibited to use the voltage earthing system to carry out the neutral point immediate grounding device.
6、 發(fā)電機(jī)與市電的雙向開關(guān)必須十分可靠,以防倒送電。雙向開關(guān)的接線可靠性需經(jīng)過(guò)當(dāng)?shù)毓╇姴块T的檢驗(yàn)認(rèn)可。
6. The bidirectional switch between the generator and the mains must be very reliable to prevent reverse power transmission. The wiring reliability of the bidirectional switch needs to be inspected and approved by the local power supply department.
7、 起動(dòng)電瓶的接線必須牢固。
7. The wiring of the starting battery must be firm.
感謝您的閱讀,此文的文章來(lái)源:
天然氣發(fā)電機(jī)組更多的內(nèi)容和問(wèn)題請(qǐng)點(diǎn)擊:
http://m.dgtmcnc.com我們會(huì)繼續(xù)努力的為您提供服務(wù),感謝您的支持!
Thank you for reading. The source of this article is: Natural gas power generation units. For more information and questions, please click on:
http://m.dgtmcnc.com We will continue to work hard to provide you with services. Thank you for your support!