水輪發(fā)電機(jī)組引水系統(tǒng)的檢查事項(xiàng)

來(lái)源:http://m.dgtmcnc.com/ 文章作者:濟(jì)柴環(huán)能 發(fā)布時(shí)間:2021-11-12
(1)進(jìn)水口攔污柵已安裝調(diào)試完工并清理干凈檢驗(yàn)合格,攔污柵差壓測(cè)壓傳感器與測(cè)量?jī)x表已安裝完工檢驗(yàn)調(diào)試合格。
(1) The installation and commissioning of the trash rack at the water inlet have been completed and cleaned, and the inspection is qualified. The installation and commissioning of the differential pressure pressure sensor and measuring instrument of the trash rack have been completed, and the inspection and commissioning are qualified.
(2)水口閘門(mén)門(mén)槽已清掃干凈檢驗(yàn)合格。檢修閘門(mén)、工作閘門(mén)、充水閥、啟閉裝置已安裝完工,在無(wú)水情況下手動(dòng)、自動(dòng)操作均已調(diào)試合格,啟閉情況良好,啟閉時(shí)間應(yīng)符合設(shè)計(jì)要求。檢修閘門(mén)、工作閘門(mén)在關(guān)閉狀態(tài)。
(2) The gate slot of the water inlet gate has been cleaned and passed the inspection. The installation of bulkhead gate, service gate, water filling valve and hoisting device has been completed. Under the condition of no water, the manual and automatic operation have been debugged, the hoisting condition is good, and the hoisting time shall meet the design requirements. The bulkhead gate and service gate are closed.
(3)壓力管道、調(diào)壓井及通氣孔、蝸殼、尾水管等過(guò)水通流系統(tǒng)均已檢驗(yàn)合格清理干凈。灌漿孔已封堵。測(cè)壓頭已裝好,測(cè)壓管閥門(mén)、測(cè)量表計(jì)均已安裝。壓力管道上如有測(cè)流量裝置,無(wú)水調(diào)試應(yīng)合格。伸縮節(jié)間隙應(yīng)均勻,盤(pán)根有足夠的緊量。非本期發(fā)電部分分叉管悶頭已可靠封堵。所有進(jìn)入孔(門(mén))的蓋板均已嚴(yán)密封閉。
(3) The penstock, surge shaft, vent hole, volute, draft tube and other water passage systems have been inspected and cleaned. The grouting hole has been blocked. The pressure measuring head has been installed, and the pressure measuring pipe, valve and measuring meter have been installed. If there is a flow measuring device on the penstock, the water free commissioning shall be qualified. The gap between expansion joints shall be uniform and the packing shall have sufficient tightness. The bifurcated pipe bulkhead of non current power generation has been reliably blocked. The cover plates of all access holes (doors) have been tightly closed.
高斯通氣門(mén)
(4)蝴蝶閥(或球閥)及其旁通閥已安裝完工調(diào)試合格,啟閉情況良好,處于關(guān)閉狀態(tài)。油壓裝置及操作系統(tǒng)已安裝完工檢驗(yàn)合格,油泵運(yùn)轉(zhuǎn)正常。
(4) Butterfly valve (or ball valve) and its bypass valve have been installed, debugged, opened and closed in good condition and are closed. The oil pressure device and operating system have been installed and passed the inspection, and the oil pump operates normally.
(5)蝸殼、轉(zhuǎn)輪室及尾水管已清掃干凈,固定轉(zhuǎn)輪的楔子板、軸流式轉(zhuǎn)輪的懸掛吊具或臨時(shí)支座等均已拆除。
(5) The volute, runner chamber and draft tube have been cleaned, and the wedge plate fixing the runner, the suspension sling or temporary support of the axial-flow Runner have been removed.
(6)蝸殼及尾水管排水閥啟閉情況良好并處于關(guān)閉位置。
(6) The drain valve of volute and draft tube shall be opened and closed well and in the closed position.
(7)尾水閘門(mén)門(mén)槽及其周?chē)亚謇砀蓛簟N菜l門(mén)及其啟閉裝置已完裝完工,檢驗(yàn)合格,啟閉情況良好。尾水閘門(mén)處于關(guān)閉狀態(tài),尾水閘門(mén)啟閉機(jī)及抓梁可隨時(shí)投入工作。尾水閘門(mén)室或尾水調(diào)壓井、尾水洞已清理干凈,尾水閘門(mén)室閘門(mén)及啟閉裝置已安裝完工檢驗(yàn)合格,啟閉情況良好,閘門(mén)處于關(guān)閉狀態(tài)。
(7) The Tailrace Gate Slot and its surroundings have been cleaned. The Tailrace Gate and its hoisting device have been installed, inspected and qualified, and the hoisting is in good condition. The Tailrace Gate is closed, and the Tailrace Gate Hoist and grab beam can be put into operation at any time. The Tailrace Gate chamber or tailrace surge shaft and tailrace tunnel have been cleaned, the gate and hoisting device of the Tailrace Gate Chamber have been installed, passed the inspection, opened and closed in good condition, and the gate is closed.
(8)電站上下游水位測(cè)量系統(tǒng)安裝調(diào)試合格,水位信號(hào)遠(yuǎn)傳正確。
(8) The installation and commissioning of the upstream and downstream water level measurement system of the power station are qualified, and the remote transmission of water level signal is correct.
以上就是今天給大家講解的詳細(xì)內(nèi)容,更多的精彩內(nèi)容請(qǐng)點(diǎn)擊我們的網(wǎng)站高斯通氣門(mén)http://m.dgtmcnc.com,我們會(huì)有更多的精彩內(nèi)容等您查看.
The above is the detailed content explained to you today. For more wonderful content, please click on our website http://m.dgtmcnc.com , we will have more wonderful content for you to see

相關(guān)產(chǎn)品 / Related products

聯(lián)系我們
    濟(jì)南濟(jì)柴環(huán)能燃?xì)獍l(fā)電設(shè)備有限公司
  • 國(guó)內(nèi)業(yè)務(wù):羅總18653152416
    王總13012995645
  • 國(guó)外業(yè)務(wù):李總18668968402
    張總18678860619
  • 座 機(jī):0531-62325028 / 69951266
  • 傳 真:0531-69958299
  • 郵 箱:hengnenghr@163.com
  • 地 址:中國(guó)(山東)自由貿(mào)易試驗(yàn)區(qū)濟(jì)南片區(qū)孫村街道經(jīng)十東路33688號(hào)章錦綜合保稅區(qū)聯(lián)東U谷科創(chuàng)中心5號(hào)樓101
濟(jì)南濟(jì)柴環(huán)能燃?xì)獍l(fā)電設(shè)備有限公司     網(wǎng)站備案號(hào):魯ICP備18052890號(hào)-3  網(wǎng)站地圖 XML TXT

截屏,微信識(shí)別二維碼

微信號(hào):王總13012995645

點(diǎn)擊微信號(hào)復(fù)制,添加好友

 打開(kāi)微信